Skip to content Skip to footer
about us

We proudly fuel the world's future

Kalrez Petroleum (Seram) Limited operates the Bula Oil Field East Seram, Ambon, Maluku (Indonesia) under a production sharing contract with SKKmigas.

This contract is from 1st
November 2019 until 30th October, 2039

The concession area covers Lemon Bula Field, Bula Tenggara and Bula Air. Current production has been stable over the years with good upside potential.

What we offer

Well Maintained Production Facilities of Bula I

Condition of production facilities after repair and improvement (2000-2017)

Wells have been fenced and treated

Pipe Lines and Flow Lines have been arranged

Gathering Stations & Tanks has met the standard

Secure tanker (Jetty) facility

Installed Water Treatment Plant according to KLH standard

upgrades on other supporting facilities

What we offer

Well Maintained Production Facilities of Bula II

Condition of production facilities after repair and improvement (2000-2017)

Transfer Line

3 MOS (Main Oil Storage)

Block Station Tank (4 tanks)

Bula Air Station Tank (3 Tanks)

Bula Tenggara Station (3 ground pits)

Bula Lemon Station

Block Station

Bula Tenggara Gathering Station

Fasilitas Oil Water Separation

Strategic Importance Of Bula

Bula is a chosen Location for developing large navy jetty, fuel & cold storage clusters, emergency air landing strip,
equipment repair & maintenance centre.

A well developed Bula is important to the territorial security of East Indonesia

Automation
80%
Engineering
90%

Apart from infilled drillings & Enhance Oil Recovery (EOR) we will apply the latest technologies in Bula

In order to increase the oil recovery, horizontal wells and multi branch wells are applied. But these technology are complex and expensive.

T-type multi-branch drilling technology uses special flexible drilling tools and trajectory control technology, including casing milling, deflecting, and horizontal drilling, can be completed in the reservoir.

Automation
80%
Engineering
90%

The Latest T-type multi-branch drilling technology

Success in T-type Multi-branch Drilling has far reaching implication for Pertamina Hulu Rokan (PHR) and many other oil fields across Indonesia.

There are some 5,000 low production oil wells in Duri which has the potential of increasing in oil
production.

During many in-situ T-type drillings in China, production increase of up to 4 to 5 times were recorded.

Automation
80%
Engineering
90%
Meet the professionals

The best workers

These professionals are essential in driving innovation, maximizing efficiency, and ensuring safe operations in one of the world’s most challenging and dynamic sectors.

Seno Sarjono

Engineer

Retno Dewati

Engineer
Hello

Kalrez Petroleum is an energy company committed to innovation, sustainability, quality, safety, advanced technology, and exceptional customer service.

Office
Menara Prima Lt. 17
Kawasan Mega Kuningan Blok 6.2
Jakarta 12950

info@kalrez-petroleum.com
+62 252 3508

Kalrez Petroleum © 2025. All Rights Reserved.